Adding a new node or step
Once a workflow node has been added, other steps can then be added and configured.
New steps can be added directly beneath a currently highlighted node or as the last step of a highlighted workflow node. Steps can be promoted (moved up) or demoted (moved down) in the Task Assistant window.
For more information about step configuration, see Introducing_the_Designer_tab.
手順:
- Start ArcMap.
- If necessary, click the Task Assistant Window button on the Task Manager toolbar to display the Task Assistant window.
- Load a task assistant workflow.
-
Click the New Step button on the Task Assistant toolbar.
A new step appears in the Task Assistant window.
- Click to highlight the new step.
- If necessary, click any of the step management tools on the Task Assistant window to place the step at the level you want.
-
To name the new step, right-click the new step in the Task Assistant window and choose Rename Step.
The step name becomes editable.
- Type a new step name.
-
Press Enter.
Learn more about task_assistant_steps.
メモ:You can only add a new step to an existing workflow. When a workflow has not been created or loaded in the Task Assistant window, the New Step button is unavailable on the Task Assistant toolbar.
ヒント:You can also add a new workflow step by right-clicking on the Designer tab and choosing New Step.
9/17/2010